Triple

T15951947
Position Surface form Disambiguated ID Type / Status
Subject TVM-430 E386838 entity
Predicate instanceOf P0 FINISHED
Object cab signalling and speed control system C3558 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cab signalling and speed control system
Context triple: [TVM-430, instanceOf, cab signalling and speed control system]
  • A. train control system chosen
    A train control system is a coordinated set of hardware and software components that monitor, regulate, and automate train movements to ensure safe, efficient, and reliable railway operations.
  • B. cable car system
    A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
  • C. intelligent transportation system component
    An intelligent transportation system component is a hardware or software element that collects, processes, or communicates transportation-related data to optimize traffic flow, enhance safety, and improve overall system efficiency.
  • D. transponder-based toll system
    A transponder-based toll system is an automated electronic toll collection method where vehicles equipped with small radio-frequency devices are detected and charged as they pass through toll points without stopping.
  • E. railway signaling system
    A railway signaling system is an integrated set of trackside and onboard equipment, rules, and communication protocols that control train movements to ensure safe separation, efficient routing, and protection against collisions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86da882448190a82ea962fe343b79 completed April 10, 2026, 3:25 a.m.
Created at: April 10, 2026, 4:53 a.m.