Triple

T15951846
Position Surface form Disambiguated ID Type / Status
Subject Milas-Bodrum Airport operation E386836 entity
Predicate instanceOf P0 FINISHED
Object infrastructure concession C16214 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: infrastructure concession
Context triple: [Milas-Bodrum Airport operation, instanceOf, infrastructure concession]
  • A. transport infrastructure agreement chosen
    A transport infrastructure agreement is a formal contract between parties that defines the responsibilities, funding, timelines, and performance standards for planning, building, operating, or maintaining transportation facilities such as roads, railways, ports, or airports.
  • B. infrastructure
    Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
  • C. infrastructure project
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • D. infrastructure facility
    An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
  • E. government infrastructure pipeline
    A government infrastructure pipeline is a structured, long-term sequence of planned, funded, and prioritized public works projects—such as transportation, utilities, and civic facilities—designed to guide investment, development, and maintenance of essential national or regional infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86da882448190a82ea962fe343b79 completed April 10, 2026, 3:25 a.m.
Created at: April 10, 2026, 4:53 a.m.