Triple
T15951719
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | TAV Technologies |
E386833
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | airport IT solutions provider |
C36732
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: airport IT solutions provider Context triple: [TAV Technologies, instanceOf, airport IT solutions provider]
-
A.
airport services provider
An airport services provider is an organization that delivers ground handling, passenger assistance, cargo management, and related operational support services to airlines and airport authorities.
-
B.
airport consultancy company
A specialized professional services firm that advises airports and aviation stakeholders on planning, design, operations, strategy, and regulatory compliance to optimize performance and growth.
-
C.
airport system
An airport system is an integrated network of facilities, services, and processes that manages the safe, efficient movement of passengers, cargo, and aircraft within and around an airport.
-
D.
airport authority
An airport authority is an organization responsible for the ownership, management, operation, and regulation of an airport or group of airports, ensuring safe, efficient, and compliant aviation services and facilities.
-
E.
cargo airport
A cargo airport is a specialized aviation facility designed primarily for the handling, storage, and transportation of freight and mail, featuring extensive logistics infrastructure and limited or no passenger services.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d86da882448190a82ea962fe343b79 |
completed | April 10, 2026, 3:25 a.m. |
Created at: April 10, 2026, 4:53 a.m.