Triple

T15936838
Position Surface form Disambiguated ID Type / Status
Subject Danube River Basin Management Plan E386460 entity
Predicate thirdCyclePeriod P11407 FINISHED
Object 2021–2027 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2021–2027 | Statement: [Danube River Basin Management Plan, thirdCyclePeriod, 2021–2027]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: thirdCyclePeriod
Context triple: [Danube River Basin Management Plan, thirdCyclePeriod, 2021–2027]
  • A. typicalNumberOfCycles
    Indicates the usual or characteristic count of cycles associated with an entity, process, or event.
  • B. recentCycle
    Indicates that the referenced event, process, or cycle occurred in the most recent iteration or time period relative to the current context.
  • C. transmissionCycle
    Indicates the sequence or pattern by which something (such as information, energy, or disease) is passed from one entity or stage to another over time.
  • D. evaluationCycle chosen
    Indicates the recurring period or sequence in which evaluations or assessments are conducted and reviewed.
  • E. claimsAboutThirdPeriod
    Indicates that a subject makes statements or assertions specifically concerning a third period of time or phase.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86da750008190987eb26be3f6c118 completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e17d4d08f481909f38b75e3f42d9ab completed April 17, 2026, 12:22 a.m.
PD Predicate disambiguation batch_69e142d37cd88190ab50760f1783e20c completed April 16, 2026, 8:13 p.m.
Created at: April 10, 2026, 4:53 a.m.