Triple
T15936629
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | International Monitoring System |
E386456
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | component of CTBT verification regime |
C36705
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: component of CTBT verification regime Context triple: [International Monitoring System, instanceOf, component of CTBT verification regime]
-
A.
reactor safety research program
A reactor safety research program is an organized, systematic effort to study, evaluate, and improve the safety, reliability, and risk management of nuclear reactors through experiments, modeling, and analysis.
-
B.
nuclear weapons component plant
A nuclear weapons component plant is an industrial facility dedicated to designing, manufacturing, and assembling specialized parts and subsystems used in the construction and maintenance of nuclear weapons.
-
C.
IAEA programme
An IAEA programme is a coordinated set of activities and initiatives organized by the International Atomic Energy Agency to promote the safe, secure, and peaceful use of nuclear science and technology among its member states.
-
D.
nuclear test
A nuclear test is an experimental detonation or controlled release of nuclear energy conducted to develop, evaluate, or demonstrate the performance and effects of nuclear weapons or technology.
-
E.
nuclear weapons assembly plant
A nuclear weapons assembly plant is a highly secure industrial facility where nuclear and non-nuclear components are manufactured, integrated, and tested to produce complete nuclear weapons in compliance with strict safety, security, and regulatory standards.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d86da750008190987eb26be3f6c118 |
completed | April 10, 2026, 3:25 a.m. |
Created at: April 10, 2026, 4:53 a.m.