Triple
T15934397
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | City Works Eatery & Pour House |
E386403
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | gastropub |
C8087
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: gastropub Context triple: [City Works Eatery & Pour House, instanceOf, gastropub]
-
A.
drinking establishment
chosen
A drinking establishment is a venue where alcoholic beverages are prepared, sold, and consumed, often providing seating, social interaction, and sometimes entertainment or food.
-
B.
gourmet restaurant
A gourmet restaurant is a high-end dining establishment that offers meticulously prepared, artistically presented dishes made from premium ingredients, often accompanied by exceptional service and an extensive wine selection.
-
C.
cocktail bar
A cocktail bar is a social venue that specializes in serving a variety of mixed alcoholic drinks, often crafted with distinctive recipes, fresh ingredients, and an emphasis on atmosphere and presentation.
-
D.
brewery
A brewery is a facility where beer is produced through the processes of mashing, fermenting, conditioning, and packaging, often combining industrial equipment with craft-based techniques.
-
E.
bistro
A bistro is a small, informal restaurant offering simple, moderately priced meals and drinks in a relaxed, often cozy setting.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d86da750008190987eb26be3f6c118 |
completed | April 10, 2026, 3:25 a.m. |
Created at: April 10, 2026, 4:53 a.m.