Triple
T15934119
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Chaves Municipality |
E386394
|
entity |
| Predicate | hasTransport |
P1298
|
FINISHED |
| Object | N2 road |
E813646
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: N2 road | Statement: [Chaves Municipality, hasTransport, N2 road]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: N2 road Context triple: [Chaves Municipality, hasTransport, N2 road]
-
A.
N2 road
The N2 road is a major national highway in France that serves as an important route connecting Paris to the Belgian border and passing near towns such as Mitry-Mory.
-
B.
N2 road
chosen
The N2 road is a famous Portuguese national highway that runs the length of the country from north to south, often compared to Route 66 for its scenic and cultural significance.
-
C.
N1 road
The N1 road is a major Belgian national route that connects Antwerp with Brussels and other key urban areas, serving as an important regional traffic artery.
-
D.
N1 road
The N1 road is a major national primary route in Ireland that forms part of the main corridor between Dublin and the border with Northern Ireland.
-
E.
N4 road
The N4 road is a major national primary route in Ireland that connects Dublin to Sligo, passing through several counties including County Longford.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d86da750008190987eb26be3f6c118 |
completed | April 10, 2026, 3:25 a.m. |
| NER | Named-entity recognition | batch_69e156a7bdd88190b1d7349ef920fd06 |
completed | April 16, 2026, 9:37 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ffbe727c348190907c9e7a5db6031d |
completed | May 9, 2026, 11:08 p.m. |
Created at: April 10, 2026, 4:53 a.m.