Triple
T15899169
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Omo River |
E385538
|
entity |
| Predicate | hasDam |
P8736
|
FINISHED |
| Object |
Gibe II Dam
Gibe II Dam is a hydroelectric power facility in Ethiopia that harnesses the flow of the Omo River to generate electricity.
|
E1184036
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Gibe II Dam | Statement: [Omo River, hasDam, Gibe II Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Gibe II Dam Context triple: [Omo River, hasDam, Gibe II Dam]
-
A.
Gibe III Dam
Gibe III Dam is a large hydroelectric dam in Ethiopia that generates significant power and has been controversial for its environmental and social impacts on the Omo River basin and Lake Turkana.
-
B.
Hatnur Dam
Hatnur Dam is a major irrigation and flood-control dam built on the Tapi River in Maharashtra, India.
-
C.
Fedaia Dam
Fedaia Dam is a hydroelectric dam and reservoir in the Dolomites of northern Italy, situated beneath the Marmolada massif.
-
D.
Almatti Dam
Almatti Dam is a major hydroelectric and irrigation dam in Karnataka, India, built across the Krishna River as part of the Upper Krishna Project.
-
E.
Qaraoun Dam
Qaraoun Dam is a major concrete dam in Lebanon that creates Lake Qaraoun, serving as a key source of hydroelectric power, irrigation, and water storage for the Litani River basin.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Gibe II Dam Triple: [Omo River, hasDam, Gibe II Dam]
Generated description
Gibe II Dam is a hydroelectric power facility in Ethiopia that harnesses the flow of the Omo River to generate electricity.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Gibe II Dam Target entity description: Gibe II Dam is a hydroelectric power facility in Ethiopia that harnesses the flow of the Omo River to generate electricity.
-
A.
Gibe III Dam
Gibe III Dam is a large hydroelectric dam in Ethiopia that generates significant power and has been controversial for its environmental and social impacts on the Omo River basin and Lake Turkana.
-
B.
Hatnur Dam
Hatnur Dam is a major irrigation and flood-control dam built on the Tapi River in Maharashtra, India.
-
C.
Fedaia Dam
Fedaia Dam is a hydroelectric dam and reservoir in the Dolomites of northern Italy, situated beneath the Marmolada massif.
-
D.
Almatti Dam
Almatti Dam is a major hydroelectric and irrigation dam in Karnataka, India, built across the Krishna River as part of the Upper Krishna Project.
-
E.
Qaraoun Dam
Qaraoun Dam is a major concrete dam in Lebanon that creates Lake Qaraoun, serving as a key source of hydroelectric power, irrigation, and water storage for the Litani River basin.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d86da5b800819083a31be937d738b0 |
completed | April 10, 2026, 3:25 a.m. |
| NER | Named-entity recognition | batch_69e1563bd0688190b6f7a695be0a4625 |
completed | April 16, 2026, 9:35 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ffb5a1b1548190a8579cebf9e71121 |
completed | May 9, 2026, 10:30 p.m. |
| NEDg | Description generation | batch_69ffb62f3d8881908ede4a9a4b53bef2 |
completed | May 9, 2026, 10:33 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69ffb6f3154481909632913f4d7cfdba |
completed | May 9, 2026, 10:36 p.m. |
Created at: April 10, 2026, 4:51 a.m.