Triple

T15897603
Position Surface form Disambiguated ID Type / Status
Subject Mattapan Yard E385500 entity
Predicate adjacentTo P224 FINISHED
Object Mattapan station E178391 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mattapan station | Statement: [Mattapan Yard, adjacentTo, Mattapan station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Mattapan station
Context triple: [Mattapan Yard, adjacentTo, Mattapan station]
  • A. Mattapan station chosen
    Mattapan station is a transit station in Boston, Massachusetts, serving as the terminus of the MBTA's Ashmont–Mattapan High-Speed Line.
  • B. Medford station
    Medford station is a Long Island Rail Road commuter rail stop located in Medford, New York, serving passengers on the Ronkonkoma Branch.
  • C. Beverly Farms station
    Beverly Farms station is a commuter rail stop in the Beverly Farms neighborhood of Beverly, Massachusetts, served by the MBTA's Newburyport/Rockport Line.
  • D. Beverly station
    Beverly station is a Massachusetts Bay Transportation Authority commuter rail station in Beverly, Massachusetts, serving as a key junction and terminal point for several North Shore rail lines.
  • E. Malden Center station
    Malden Center station is a major transit hub in Malden, Massachusetts, serving both MBTA Orange Line subway and commuter rail services.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86da5b800819083a31be937d738b0 completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e1563b0e4c8190b338672dfb122665 completed April 16, 2026, 9:35 p.m.
NED1 Entity disambiguation (via context triple) batch_69ffe46b06688190a02fee3700efd709 completed May 10, 2026, 1:50 a.m.
Created at: April 10, 2026, 4:51 a.m.