Triple

T15897538
Position Surface form Disambiguated ID Type / Status
Subject SS and Police Leadership in occupied territories E385499 entity
Predicate instanceOf P0 FINISHED
Object Nazi command structure C23961 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Nazi command structure
Context triple: [SS and Police Leadership in occupied territories, instanceOf, Nazi command structure]
  • A. Wehrmacht organization
    The Wehrmacht organization is a structured representation of the hierarchical, functional, and administrative components of Nazi Germany’s unified armed forces, including their command chains, unit types, and operational relationships.
  • B. Wehrmacht high command
    The Wehrmacht high command was the central military leadership of Nazi Germany responsible for planning, directing, and coordinating the operations of the German armed forces during the Second World War.
  • C. Wehrmacht headquarters
    The Wehrmacht headquarters was the central command authority of Nazi Germany's unified armed forces, responsible for strategic planning, coordination, and direction of military operations during World War II.
  • D. Nazi economic authority
    A Nazi economic authority is a state-controlled institution or official body within Nazi Germany responsible for directing, regulating, and coordinating economic activity in line with the regime’s ideological, militaristic, and autarkic goals.
  • E. Nazi SS office chosen
    A Nazi SS office was an administrative and operational unit of the Schutzstaffel responsible for planning, coordinating, and executing the regime’s ideological, security, and genocidal policies.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86da5b800819083a31be937d738b0 completed April 10, 2026, 3:25 a.m.
Created at: April 10, 2026, 4:51 a.m.