Triple
T15881973
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Clint, Texas |
E385093
|
entity |
| Predicate | hasTransportation |
P105
|
FINISHED |
| Object | Texas State Highway 20 |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Texas State Highway 20 | Statement: [Clint, Texas, hasTransportation, Texas State Highway 20]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Texas State Highway 20 Context triple: [Clint, Texas, hasTransportation, Texas State Highway 20]
-
A.
Texas State Highway 21
Texas State Highway 21 is a major east–west state highway in Texas that follows portions of the historic El Camino Real de los Tejas, connecting several central and eastern Texas communities.
-
B.
Texas State Highway 22
Texas State Highway 22 is a state highway in Texas that runs east–west across central parts of the state, connecting several towns and serving as a regional transportation route.
-
C.
Texas State Highway 27
Texas State Highway 27 is a state roadway in Texas that serves communities in the Hill Country region, including areas within Kerr County.
-
D.
Texas State Highway 29
Texas State Highway 29 is an east–west state highway in central Texas that runs through multiple counties and communities, serving as a key regional route connecting rural areas with larger towns and cities.
-
E.
Texas State Highway 205
Texas State Highway 205 is a state highway in northeastern Texas that connects the city of Rockwall with surrounding communities as part of the regional road network.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Texas State Highway 20 Target entity description: Texas State Highway 20 is a state highway in far West Texas that runs through the El Paso area, serving as a local alternative to Interstate 10 and connecting several communities near the U.S.–Mexico border.
-
A.
Texas State Highway 21
Texas State Highway 21 is a major east–west state highway in Texas that follows portions of the historic El Camino Real de los Tejas, connecting several central and eastern Texas communities.
-
B.
Texas State Highway 22
Texas State Highway 22 is a state highway in Texas that runs east–west across central parts of the state, connecting several towns and serving as a regional transportation route.
-
C.
Texas State Highway 27
Texas State Highway 27 is a state roadway in Texas that serves communities in the Hill Country region, including areas within Kerr County.
-
D.
Texas State Highway 29
Texas State Highway 29 is an east–west state highway in central Texas that runs through multiple counties and communities, serving as a key regional route connecting rural areas with larger towns and cities.
-
E.
Texas State Highway 205
Texas State Highway 205 is a state highway in northeastern Texas that connects the city of Rockwall with surrounding communities as part of the regional road network.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d86da4e86481909f1325fdc971b5ec |
completed | April 10, 2026, 3:25 a.m. |
| NER | Named-entity recognition | batch_69e156173e248190901641d838ecb40f |
completed | April 16, 2026, 9:35 p.m. |
Created at: April 10, 2026, 4:51 a.m.