Triple

T15871886
Position Surface form Disambiguated ID Type / Status
Subject Hazel Wright Organ E384847 entity
Predicate reinstallationCompleted P3055 FINISHED
Object early 2020s LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: early 2020s | Statement: [Hazel Wright Organ, reinstallationCompleted, early 2020s]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: reinstallationCompleted
Context triple: [Hazel Wright Organ, reinstallationCompleted, early 2020s]
  • A. installationCompleted chosen
    Indicates that the process of installing something has finished successfully.
  • B. installedAfter
    Indicates that one installation event occurred later in time than another installation event.
  • C. requiresInstallation
    Indicates that one entity must be installed or set up before the other can be used or become operational.
  • D. installedComponent
    Indicates that one entity has been installed as a component or part within another entity or system.
  • E. controlledInstallation
    Indicates that an entity has authoritative oversight or management responsibility over the setup, configuration, or deployment of another entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86da4e86481909f1325fdc971b5ec completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e174de2cd48190ab18e48c9f051a2a completed April 16, 2026, 11:46 p.m.
PD Predicate disambiguation batch_69e142c3e18c8190bb7b023f4a0eaebb completed April 16, 2026, 8:12 p.m.
Created at: April 10, 2026, 4:51 a.m.