Triple
T15838805
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | STS-93 |
E384048
|
entity |
| Predicate | precededBy |
P97
|
FINISHED |
| Object | STS-96 |
E202962
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-96 | Statement: [STS-93, precededBy, STS-96]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: STS-96 Context triple: [STS-93, precededBy, STS-96]
-
A.
STS-96
chosen
STS-96 was a 1999 NASA Space Shuttle Discovery mission that performed the first docking with the International Space Station after its initial assembly flights, delivering supplies and equipment.
-
B.
STS-76
STS-76 was a 1996 NASA Space Shuttle Atlantis mission notable for delivering astronaut Shannon Lucid to the Russian Mir space station for a long-duration stay.
-
C.
STS-97
STS-97 was a Space Shuttle Endeavour mission in 2000 that delivered and installed the first set of U.S.-built solar arrays to the International Space Station, significantly increasing the station’s power capacity.
-
D.
STS-36
STS-36 was a 1990 NASA Space Shuttle Atlantis mission primarily dedicated to deploying a classified U.S. Department of Defense payload into orbit.
-
E.
STS-99
STS-99 was a Space Shuttle Endeavour mission in 2000 that conducted the Shuttle Radar Topography Mission to create a highly detailed 3D map of most of Earth’s land surface.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d86da34c888190976e06c4019d415a |
completed | April 10, 2026, 3:25 a.m. |
| NER | Named-entity recognition | batch_69e142e4fa24819086a1a226082ac2d3 |
completed | April 16, 2026, 8:13 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ffa13c931481908ed9fd10fddd867c |
completed | May 9, 2026, 9:03 p.m. |
Created at: April 10, 2026, 4:49 a.m.