Triple
T15834899
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | IEEE 1901 |
E383960
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | power line communication standard |
C2787
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: power line communication standard Context triple: [IEEE 1901, instanceOf, power line communication standard]
-
A.
telecommunications standard
chosen
A telecommunications standard is an agreed-upon set of technical specifications and protocols that ensure compatibility, interoperability, and reliable communication across different telecom networks and devices.
-
B.
EV charging communication standard
A standardized set of protocols and message formats that enable interoperable, secure communication between electric vehicles, charging stations, and backend systems for managing charging sessions and related services.
-
C.
substation automation standard
A substation automation standard defines the protocols, architectures, and requirements that enable interoperable, secure, and automated monitoring, control, and protection of electrical substations.
-
D.
IEEE standard
An IEEE standard is a formally documented set of technical specifications and guidelines developed and maintained by the Institute of Electrical and Electronics Engineers to ensure interoperability, safety, and quality across electrical, electronic, and computing technologies.
-
E.
consumer electronics control standard
A consumer electronics control standard is a protocol that enables interoperable communication and coordinated control among different home entertainment and smart devices over a shared interface.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d86da34c888190976e06c4019d415a |
completed | April 10, 2026, 3:25 a.m. |
Created at: April 10, 2026, 4:49 a.m.