Triple

T15832674
Position Surface form Disambiguated ID Type / Status
Subject Brazilian Growth Acceleration Program E383908 entity
Predicate phase P5784 FINISHED
Object PAC 1 E1179088 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: PAC 1 | Statement: [Brazilian Growth Acceleration Program, phase, PAC 1]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: PAC 1
Context triple: [Brazilian Growth Acceleration Program, phase, PAC 1]
  • A. PAC 1 chosen
    PAC 1 is the first phase of Brazil’s Growth Acceleration Program, a large-scale federal initiative focused on boosting economic development through major investments in infrastructure and public works.
  • B. PAC-1
    PAC-1 is the first major operational configuration of the U.S. Patriot surface-to-air missile system, introducing enhanced capabilities for air defense against aircraft and limited missile threats.
  • C. PAC
    PAC is the stock ticker symbol for Grupo Aeroportuario del Pacífico, a major Mexican airport operator that manages multiple airports in the Pacific region.
  • D. PAC
    PAC is the IATA airport code for Albrook "Marcos A. Gelabert" International Airport serving Panama City, Panama.
  • E. PAC
    PAC is a major Brazilian federal investment initiative focused on accelerating economic growth through large-scale infrastructure and social development projects.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86da34c888190976e06c4019d415a completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e11e653e388190a4696cdb22546715 completed April 16, 2026, 5:37 p.m.
NED1 Entity disambiguation (via context triple) batch_69ffa135be84819084f7c20c2bc01b47 completed May 9, 2026, 9:03 p.m.
Created at: April 10, 2026, 4:49 a.m.