Triple

T15830102
Position Surface form Disambiguated ID Type / Status
Subject Station Explorer for X-ray Timing and Navigation Technology E383846 entity
Predicate instanceOf P0 FINISHED
Object spacecraft navigation technology demonstration C2826 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: spacecraft navigation technology demonstration
Context triple: [Station Explorer for X-ray Timing and Navigation Technology, instanceOf, spacecraft navigation technology demonstration]
  • A. spacecraft chosen
    A spacecraft is a vehicle or device designed to travel beyond Earth's atmosphere for purposes such as exploration, communication, research, or transportation.
  • B. space technology
    Space technology encompasses the tools, systems, and methods used to explore, utilize, and operate in outer space, including spacecraft, satellites, launch vehicles, and supporting ground infrastructure.
  • C. space technology
    Space technology encompasses the tools, systems, and methods developed to explore, utilize, and operate in outer space, including spacecraft, satellites, launch vehicles, and supporting ground infrastructure.
  • D. in-situ resource utilization technology demonstrator
    An in-situ resource utilization technology demonstrator is a prototype system designed to test and validate methods for extracting, processing, and using local materials (such as lunar or Martian regolith) to support space missions and reduce dependence on Earth-supplied resources.
  • E. spacecraft program
    A spacecraft program is an organized, long-term initiative that plans, develops, launches, and operates one or more spacecraft to achieve specific scientific, commercial, or exploratory objectives.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86da34c888190976e06c4019d415a completed April 10, 2026, 3:25 a.m.
Created at: April 10, 2026, 4:49 a.m.