Triple

T15825913
Position Surface form Disambiguated ID Type / Status
Subject Bheri River E383740 entity
Predicate associatedProject P14971 FINISHED
Object Bheri Babai Diversion Multipurpose Project
Bheri Babai Diversion Multipurpose Project is a major irrigation and hydropower initiative in Nepal that diverts water through a tunnel from the Bheri River to the Babai River to boost agriculture and generate electricity.
E1178750 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bheri Babai Diversion Multipurpose Project | Statement: [Bheri River, associatedProject, Bheri Babai Diversion Multipurpose Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Bheri Babai Diversion Multipurpose Project
Context triple: [Bheri River, associatedProject, Bheri Babai Diversion Multipurpose Project]
  • A. Upper Bhote Koshi Hydroelectric Project
    The Upper Bhote Koshi Hydroelectric Project is a run-of-river hydropower plant in Nepal that harnesses the steep gradient and strong flow of the Bhote Koshi River to generate electricity for the national grid.
  • B. Parbati Hydroelectric Project
    The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
  • C. Upper Karnali Hydropower Project
    The Upper Karnali Hydropower Project is a major planned run-of-river hydroelectric development in Nepal designed to harness the Karnali River for large-scale power generation and regional energy export.
  • D. Bhadra Hydel Project
    Bhadra Hydel Project is a hydroelectric power station in Karnataka, India, that harnesses the flow of the Bhadra River to generate electricity and support regional irrigation.
  • E. Ujh Multipurpose Project
    The Ujh Multipurpose Project is a planned Indian infrastructure scheme aimed at harnessing the waters of the Ujh River for irrigation, drinking water supply, and hydroelectric power generation.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Bheri Babai Diversion Multipurpose Project
Triple: [Bheri River, associatedProject, Bheri Babai Diversion Multipurpose Project]
Generated description
Bheri Babai Diversion Multipurpose Project is a major irrigation and hydropower initiative in Nepal that diverts water through a tunnel from the Bheri River to the Babai River to boost agriculture and generate electricity.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Bheri Babai Diversion Multipurpose Project
Target entity description: Bheri Babai Diversion Multipurpose Project is a major irrigation and hydropower initiative in Nepal that diverts water through a tunnel from the Bheri River to the Babai River to boost agriculture and generate electricity.
  • A. Upper Bhote Koshi Hydroelectric Project
    The Upper Bhote Koshi Hydroelectric Project is a run-of-river hydropower plant in Nepal that harnesses the steep gradient and strong flow of the Bhote Koshi River to generate electricity for the national grid.
  • B. Parbati Hydroelectric Project
    The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
  • C. Upper Karnali Hydropower Project
    The Upper Karnali Hydropower Project is a major planned run-of-river hydroelectric development in Nepal designed to harness the Karnali River for large-scale power generation and regional energy export.
  • D. Bhadra Hydel Project
    Bhadra Hydel Project is a hydroelectric power station in Karnataka, India, that harnesses the flow of the Bhadra River to generate electricity and support regional irrigation.
  • E. Ujh Multipurpose Project
    The Ujh Multipurpose Project is a planned Indian infrastructure scheme aimed at harnessing the waters of the Ujh River for irrigation, drinking water supply, and hydroelectric power generation.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86da34c888190976e06c4019d415a completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e11e602e5481908baa71c3d9b2008f completed April 16, 2026, 5:37 p.m.
NED1 Entity disambiguation (via context triple) batch_69ff999da5008190921b3f129787999e completed May 9, 2026, 8:31 p.m.
NEDg Description generation batch_69ff9a82cadc8190a57f40062d29a998 completed May 9, 2026, 8:35 p.m.
NED2 Entity disambiguation (via description) batch_69ff9b5dbf80819085fdfcdff424511b completed May 9, 2026, 8:38 p.m.
Created at: April 10, 2026, 4:49 a.m.