Triple

T15818097
Position Surface form Disambiguated ID Type / Status
Subject Folkston, Georgia E383530 entity
Predicate railTrafficFeature P110338 FINISHED
Object convergence of multiple CSX rail lines LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: convergence of multiple CSX rail lines | Statement: [Folkston, Georgia, railTrafficFeature, convergence of multiple CSX rail lines]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: railTrafficFeature
Context triple: [Folkston, Georgia, railTrafficFeature, convergence of multiple CSX rail lines]
  • A. railwayTraffic
    Indicates the presence, flow, or management of train movements along railway lines between locations.
  • B. railTracks
    Indicates that one entity consists of, includes, or is associated with rail tracks used for guiding trains or rail vehicles.
  • C. coordinatesRailTrafficWith
    Indicates that one entity organizes and synchronizes rail operations or movements with another entity to ensure coordinated train traffic.
  • D. railwayTrafficDirection
    Indicates the customary side of the track on which trains are operated or expected to run within a given railway system or segment.
  • E. isRailInfrastructure chosen
    Indicates that something functions as or is classified as part of a railway-related physical infrastructure or system.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86da2858c819090cc8481e7207b6e completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e0c4a4332c8190bc525e06d6f3a6b4 completed April 16, 2026, 11:14 a.m.
PD Predicate disambiguation batch_69e0053b847c8190945726c3ddac21cc completed April 15, 2026, 9:38 p.m.
Created at: April 10, 2026, 4:49 a.m.