Triple

T15799910
Position Surface form Disambiguated ID Type / Status
Subject Pilgrim Mother Fountain E383070 entity
Predicate instanceOf P0 FINISHED
Object decorative fountain C7591 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: decorative fountain
Context triple: [Pilgrim Mother Fountain, instanceOf, decorative fountain]
  • A. outdoor fountain
    An outdoor fountain is a decorative water feature installed in exterior spaces that circulates or sprays water for aesthetic, ambient, or architectural enhancement.
  • B. memorial fountain
    A memorial fountain is a decorative water feature designed as a public monument to commemorate a person, group, or significant event.
  • C. choreographed fountain system
    A choreographed fountain system is an integrated arrangement of water jets, lighting, and control technology that synchronizes water movements and visual effects to music or programmed sequences for aesthetic and entertainment purposes.
  • D. ornamental pavilion
    An ornamental pavilion is a small, decorative, often open-sided structure placed in gardens or public spaces to provide shelter, focal interest, and aesthetic enhancement.
  • E. garden feature chosen
    A garden feature is a designed element within an outdoor space—such as a pond, statue, path, or seating area—intended to enhance its visual appeal, structure, or functionality.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86da16e188190b89af699f1ed0bfe completed April 10, 2026, 3:25 a.m.
Created at: April 10, 2026, 4:48 a.m.