Triple

T15799794
Position Surface form Disambiguated ID Type / Status
Subject LM-series analog ICs E383067 entity
Predicate hasNotableMember P304 FINISHED
Object LM555 E381582 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: LM555 | Statement: [LM-series analog ICs, hasNotableMember, LM555]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: LM555
Context triple: [LM-series analog ICs, hasNotableMember, LM555]
  • A. NE555 timer
    The NE555 timer is a widely used integrated circuit that provides precise timing, pulse generation, and oscillator functions in countless electronic circuits.
  • B. 555 timer IC chosen
    The 555 timer IC is a widely used integrated circuit that provides precise timing, pulse generation, and oscillator functions in countless electronic circuits.
  • C. LM567
    The LM567 is a tone decoder integrated circuit designed to detect and respond to specific input frequencies in communication and control applications.
  • D. LM7805
    The LM7805 is a widely used linear voltage regulator integrated circuit that provides a fixed 5-volt output for powering electronic circuits.
  • E. LM431
    LM431 is a popular adjustable precision shunt voltage reference IC commonly used for accurate voltage regulation and control in analog circuits.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86da16e188190b89af699f1ed0bfe completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e0b4e135b08190b736e77bac5e2bff completed April 16, 2026, 10:07 a.m.
NED1 Entity disambiguation (via context triple) batch_69ffa937f2a881908849fcded786905f completed May 9, 2026, 9:38 p.m.
Created at: April 10, 2026, 4:48 a.m.