Triple
T15797336
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Humberhead Levels |
E383014
|
entity |
| Predicate | governedBy |
P46
|
FINISHED |
| Object | Environment Agency (flood risk management) |
E3869
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Environment Agency (flood risk management) | Statement: [Humberhead Levels, governedBy, Environment Agency (flood risk management)]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Environment Agency (flood risk management) Context triple: [Humberhead Levels, governedBy, Environment Agency (flood risk management)]
-
A.
Environment Agency (England)
chosen
The Environment Agency (England) is a public body responsible for protecting and improving the environment in England, including regulating water quality, managing flood risks, and overseeing river and wildlife conservation.
-
B.
Division of Flood Management
The Division of Flood Management is a specialized branch of California’s Department of Water Resources responsible for planning, operating, and maintaining systems and programs that reduce flood risk and protect communities and infrastructure.
-
C.
Thames Estuary 2100 flood management plan
The Thames Estuary 2100 flood management plan is a long-term UK strategy developed by the Environment Agency to manage tidal flood risk in the Thames Estuary through to the end of the century, accounting for climate change and sea-level rise.
-
D.
Quaggy Flood Alleviation Scheme
The Quaggy Flood Alleviation Scheme is a civil engineering and environmental project designed to reduce flood risk along the River Quaggy while enhancing local habitats and public green spaces.
-
E.
Division of Dam Safety and Floodplain Management
The Division of Dam Safety and Floodplain Management is a unit within Virginia’s state government responsible for regulating dams and overseeing floodplain management to protect public safety and reduce flood risks.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d86da16e188190b89af699f1ed0bfe |
completed | April 10, 2026, 3:25 a.m. |
| NER | Named-entity recognition | batch_69e0b4def80481908f72733ce9133bc6 |
completed | April 16, 2026, 10:07 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ff90aea81c8190ad8bc0cdedf4b77a |
completed | May 9, 2026, 7:53 p.m. |
Created at: April 10, 2026, 4:48 a.m.