Triple

T15782701
Position Surface form Disambiguated ID Type / Status
Subject Slussen metro station E382658 entity
Predicate connectsTo P845 FINISHED
Object Saltsjöbanan E119504 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Saltsjöbanan | Statement: [Slussen metro station, connectsTo, Saltsjöbanan]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Saltsjöbanan
Context triple: [Slussen metro station, connectsTo, Saltsjöbanan]
  • A. Saltsjöbanan chosen
    Saltsjöbanan is a suburban railway line in the Stockholm area that connects central Stockholm with the eastern suburbs, including parts of Nacka Municipality.
  • B. Roslagsbanan
    Roslagsbanan is a narrow-gauge suburban railway line in the Stockholm region of Sweden that provides commuter rail services to several northern suburbs.
  • C. Ostkustbanan railway line
    The Ostkustbanan railway line is a major Swedish rail route running along the country’s east coast, connecting Stockholm with northern regions and serving numerous municipalities along the way.
  • D. Stångådalsbanan
    Stångådalsbanan is a regional railway line in southeastern Sweden that connects Linköping with coastal towns such as Västervik.
  • E. Södertälje line
    The Södertälje line is a Swedish railway route in the Stockholm area that connects several southern suburbs and towns, including Tumba, with Södertälje and the broader regional rail network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86da16e188190b89af699f1ed0bfe completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e05400716881909bc43212c8ea54d5 completed April 16, 2026, 3:14 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff90a2476c8190a153fb47cb4e7708 completed May 9, 2026, 7:53 p.m.
Created at: April 10, 2026, 4:48 a.m.