Triple
T15774862
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Polskie Koleje Państwowe |
E382463
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | infrastructure manager |
C3982
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: infrastructure manager Context triple: [Polskie Koleje Państwowe, instanceOf, infrastructure manager]
-
A.
infrastructure management company
An infrastructure management company plans, operates, maintains, and optimizes physical assets and systems—such as transportation, utilities, and public works—to ensure their reliability, efficiency, and long-term performance.
-
B.
railway infrastructure manager
chosen
A railway infrastructure manager is an entity responsible for the planning, construction, maintenance, operation, and safe management of railway tracks, signaling systems, and related fixed installations.
-
C.
infrastructure developer
An infrastructure developer designs, builds, and maintains the underlying systems, tools, and automation that support reliable, scalable, and secure software deployment and operations.
-
D.
infrastructure
Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
-
E.
infrastructure facility
An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d86da09a10819082fe9797b23e4664 |
completed | April 10, 2026, 3:25 a.m. |
Created at: April 10, 2026, 4:47 a.m.