Triple

T15774862
Position Surface form Disambiguated ID Type / Status
Subject Polskie Koleje Państwowe E382463 entity
Predicate instanceOf P0 FINISHED
Object infrastructure manager C3982 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: infrastructure manager
Context triple: [Polskie Koleje Państwowe, instanceOf, infrastructure manager]
  • A. infrastructure management company
    An infrastructure management company plans, operates, maintains, and optimizes physical assets and systems—such as transportation, utilities, and public works—to ensure their reliability, efficiency, and long-term performance.
  • B. railway infrastructure manager chosen
    A railway infrastructure manager is an entity responsible for the planning, construction, maintenance, operation, and safe management of railway tracks, signaling systems, and related fixed installations.
  • C. infrastructure developer
    An infrastructure developer designs, builds, and maintains the underlying systems, tools, and automation that support reliable, scalable, and secure software deployment and operations.
  • D. infrastructure
    Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
  • E. infrastructure facility
    An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86da09a10819082fe9797b23e4664 completed April 10, 2026, 3:25 a.m.
Created at: April 10, 2026, 4:47 a.m.