Triple

T15771437
Position Surface form Disambiguated ID Type / Status
Subject Persephone Theatre E382369 entity
Predicate associatedWithCityCentreDevelopment P96205 FINISHED
Object River Landing redevelopment project LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: River Landing redevelopment project | Statement: [Persephone Theatre, associatedWithCityCentreDevelopment, River Landing redevelopment project]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: associatedWithCityCentreDevelopment
Context triple: [Persephone Theatre, associatedWithCityCentreDevelopment, River Landing redevelopment project]
  • A. urbanDevelopmentLinkedTo
    Indicates a relationship where changes or activities in urban development are causally or correlationally connected to another factor, condition, or outcome.
  • B. urbanCenterDevelopedBy
    Indicates that an urban center was created, planned, or significantly developed through the actions or initiatives of a particular agent (such as an organization, authority, or project).
  • C. cityDevelopedBeside
    Indicates that a city was developed in close proximity to and along the side of a particular geographic feature, settlement, or infrastructure.
  • D. urbanDevelopment
    Indicates the process or activities through which urban areas are planned, expanded, or transformed, including changes to infrastructure, land use, and the built environment.
  • E. urbanDevelopmentProject chosen
    Indicates a project that plans, manages, or executes changes to urban areas, such as construction, renewal, or infrastructure improvements.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86da09a10819082fe9797b23e4664 completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e051962fe08190a6201dd48196a9ee completed April 16, 2026, 3:03 a.m.
PD Predicate disambiguation batch_69e00531e7ac8190a4190cce4f7fab4c completed April 15, 2026, 9:37 p.m.
Created at: April 10, 2026, 4:47 a.m.