Triple
T15765333
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 中部国際空港 |
E382205
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | 海上空港 |
C1644
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: 海上空港 Context triple: [中部国際空港, instanceOf, 海上空港]
-
A.
seaplane base
A seaplane base is a designated water aerodrome, often with minimal shore facilities, where seaplanes and amphibious aircraft can take off, land, dock, and receive basic services.
-
B.
public airport
chosen
A public airport is a government- or publicly-owned aviation facility open for use by the general public, providing infrastructure and services for commercial, private, and cargo air transportation.
-
C.
seaport
A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
-
D.
shipboard seaplane
A shipboard seaplane is an aircraft designed to operate from water and be launched, recovered, and serviced from a ship, typically for reconnaissance, patrol, or liaison duties at sea.
-
E.
sea fort
A sea fort is a fortified structure built on or near the sea, typically on artificial islands, rocks, or coastal waters, designed to defend harbors, coastlines, or strategic maritime routes.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d86da09a10819082fe9797b23e4664 |
completed | April 10, 2026, 3:25 a.m. |
Created at: April 10, 2026, 4:47 a.m.