Triple
T15763860
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Eucumbene Dam |
E382168
|
entity |
| Predicate | connectedTo |
P37
|
FINISHED |
| Object | Tantangara Dam |
E381080
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tantangara Dam | Statement: [Eucumbene Dam, connectedTo, Tantangara Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Tantangara Dam Context triple: [Eucumbene Dam, connectedTo, Tantangara Dam]
-
A.
Tantangara Dam
chosen
Tantangara Dam is a major concrete gravity dam in New South Wales, Australia, built as part of the Snowy Mountains Scheme to store water for hydroelectric power generation and irrigation.
-
B.
Itezhi-Tezhi Dam
Itezhi-Tezhi Dam is a major hydroelectric and water-regulation dam in Zambia that helps control flows and generate power along the Kafue River system, a key tributary of the Zambezi.
-
C.
Baipaza Dam
Baipaza Dam is a major hydroelectric dam in Tajikistan that harnesses the Vakhsh River to generate power and support regional water management.
-
D.
Rusape Dam
Rusape Dam is a major reservoir in northeastern Zimbabwe that supplies water for irrigation, domestic use, and recreation to the town of Rusape and surrounding areas.
-
E.
Bariri Dam
Bariri Dam is a hydroelectric and river regulation structure located on Brazil’s Tietê River, contributing to regional power generation and water management.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d86da09a10819082fe9797b23e4664 |
completed | April 10, 2026, 3:25 a.m. |
| NER | Named-entity recognition | batch_69e050b6c9fc8190a1bcf763c4b04b12 |
completed | April 16, 2026, 3 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ff9099335c8190b6f0fb336b3dc212 |
completed | May 9, 2026, 7:52 p.m. |
Created at: April 10, 2026, 4:47 a.m.