Triple

T15745380
Position Surface form Disambiguated ID Type / Status
Subject LAX/Metro Transit Center station E381709 entity
Predicate instanceOf P0 FINISHED
Object planned transit station C7253 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned transit station
Context triple: [LAX/Metro Transit Center station, instanceOf, planned transit station]
  • A. planned transit corridor
    A planned transit corridor is a designated route or area reserved for future development of public transportation infrastructure, such as bus rapid transit or rail lines, to guide growth and improve regional mobility.
  • B. public transit station chosen
    A public transit station is a designated facility where passengers can access, board, transfer between, and disembark from public transportation services such as buses, trains, or subways.
  • C. rapid transit station
    A rapid transit station is a designated facility where passengers board, alight, and transfer between high-frequency urban rail or metro services, typically featuring platforms, ticketing areas, and access to surrounding streets or other transport modes.
  • D. future railway station
    A future railway station is a conceptual transportation hub designed with advanced technologies, sustainable infrastructure, and adaptable spaces to efficiently manage high-capacity, multimodal passenger and freight flows.
  • E. tram station
    A tram station is a designated stopping place along a tram line where passengers can safely board, alight, and sometimes transfer between tram services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86d9e6b44819085d1f6a969ecb74c completed April 10, 2026, 3:25 a.m.
Created at: April 10, 2026, 4:46 a.m.