Triple

T15740231
Position Surface form Disambiguated ID Type / Status
Subject 555 timer IC E381582 entity
Predicate outputStageType P120430 FINISHED
Object bipolar transistor totem-pole LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: bipolar transistor totem-pole | Statement: [555 timer IC, outputStageType, bipolar transistor totem-pole]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: outputStageType
Context triple: [555 timer IC, outputStageType, bipolar transistor totem-pole]
  • A. coreStageType
    Indicates the specific kind or classification of a core stage within a larger process, system, or lifecycle.
  • B. thirdStageType
    Indicates the specific kind or classification of a third stage within a multi-stage process or structure.
  • C. coreStageEngineType
    Indicates the specific type or model of engine used in the core stage of a launch vehicle or rocket.
  • D. stageOf
    Indicates that one entity represents a particular phase, step, or developmental period within the progression or lifecycle of another entity.
  • E. optionalStage
    Indicates that a particular stage in a process, workflow, or sequence is not mandatory and may be included or skipped without invalidating the overall structure.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86d9cdb648190bf3171be0bd7d872 completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e0b4d6b5788190883746ee82c799f5 completed April 16, 2026, 10:07 a.m.
PD Predicate disambiguation batch_69e0052c6208819098165d61d378d13b completed April 15, 2026, 9:37 p.m.
PDg Predicate description generation batch_69e0b4d01c9c81909f6b611e8144c838 completed April 16, 2026, 10:07 a.m.
Created at: April 10, 2026, 4:46 a.m.