Triple

T15727975
Position Surface form Disambiguated ID Type / Status
Subject Eniwetok Atoll E381265 entity
Predicate IvyMikeSignificance P111605 FINISHED
Object first full-scale test of a thermonuclear device LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: first full-scale test of a thermonuclear device | Statement: [Eniwetok Atoll, IvyMikeSignificance, first full-scale test of a thermonuclear device]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: IvyMikeSignificance
Context triple: [Eniwetok Atoll, IvyMikeSignificance, first full-scale test of a thermonuclear device]
  • A. largestNuclearTest
    Indicates that the subject entity conducted or is associated with the largest nuclear test (by yield or scale) within a specified context or comparison set.
  • B. firstThermonuclearTest chosen
    Indicates that the subject entity conducted or was responsible for the first thermonuclear (hydrogen bomb) test associated with the object entity.
  • C. firstNuclearTest
    Indicates the event in which an entity conducts its first-ever test of a nuclear explosive device.
  • D. plutoniumFacility
    Indicates a facility that is involved in the production, processing, handling, or storage of plutonium.
  • E. nuclearPowered
    Indicates that something operates using nuclear energy as its primary power source.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86d9cdb648190bf3171be0bd7d872 completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e04fb4cc0081909efe330339474017 completed April 16, 2026, 2:55 a.m.
PD Predicate disambiguation batch_69e00526759c819088b80d85138b8974 completed April 15, 2026, 9:37 p.m.
Created at: April 10, 2026, 4:46 a.m.