Triple

T15721734
Position Surface form Disambiguated ID Type / Status
Subject Bremer County, Iowa E381109 entity
Predicate hasMajorHighway P385 FINISHED
Object Iowa Highway 3 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Iowa Highway 3 | Statement: [Bremer County, Iowa, hasMajorHighway, Iowa Highway 3]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Iowa Highway 3
Context triple: [Bremer County, Iowa, hasMajorHighway, Iowa Highway 3]
  • A. Iowa Highway 3 chosen
    Iowa Highway 3 is an east–west state highway that spans northern Iowa, connecting numerous communities across the state.
  • B. Iowa Highway 37
    Iowa Highway 37 is a state highway in western Iowa that runs east–west through rural communities and farmland, connecting several small towns and local routes.
  • C. Iowa Highway 30
    Iowa Highway 30 is a major east–west state highway crossing Iowa, serving as a key transportation corridor connecting numerous cities and intersecting several important routes.
  • D. Iowa Highway 38
    Iowa Highway 38 is a state highway in eastern Iowa that runs north–south through several communities, connecting rural areas with larger regional routes.
  • E. Iowa Highway 2
    Iowa Highway 2 is an east–west state highway spanning southern Iowa, running near the Missouri border and connecting several small towns and regional routes across the state.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86d9bf930819082b30cf6d169297c completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e04fb0b51081908e652ec4992296fa completed April 16, 2026, 2:55 a.m.
Created at: April 10, 2026, 4:45 a.m.