Triple
T15720555
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tantangara Dam |
E381080
|
entity |
| Predicate | engineeringProjectOf |
P80445
|
FINISHED |
| Object | Snowy Mountains Hydro-electric Authority |
E370985
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Snowy Mountains Hydro-electric Authority | Statement: [Tantangara Dam, engineeringProjectOf, Snowy Mountains Hydro-electric Authority]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Snowy Mountains Hydro-electric Authority Context triple: [Tantangara Dam, engineeringProjectOf, Snowy Mountains Hydro-electric Authority]
-
A.
Snowy Hydro Limited
chosen
Snowy Hydro Limited is an Australian electricity generation and retail company that operates the Snowy Mountains Hydroelectric Scheme and other energy assets.
-
B.
Hydro Tasmania
Hydro Tasmania is Australia's largest producer of renewable energy, primarily generating hydroelectric power from Tasmania's extensive network of dams and power stations.
-
C.
Snowy Hydro Scheme
The Snowy Hydro Scheme is a large-scale hydroelectricity and irrigation complex in Australia’s Snowy Mountains, renowned as one of the country’s most significant engineering projects.
-
D.
Goulburn–Murray Irrigation District
Goulburn–Murray Irrigation District is a major agricultural irrigation region in northern Victoria, Australia, supplying water to extensive dairy, horticulture, and mixed farming enterprises.
-
E.
Murrumbidgee Irrigation Limited
Murrumbidgee Irrigation Limited is an Australian company responsible for managing and operating irrigation infrastructure and water delivery services in the Murrumbidgee region of New South Wales.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: engineeringProjectOf Context triple: [Tantangara Dam, engineeringProjectOf, Snowy Mountains Hydro-electric Authority]
-
A.
productionProject
Indicates that an entity is involved in or associated with a specific production project, typically as part of its creation, development, or execution.
-
B.
developmentProject
chosen
Indicates a relationship where an organized effort or initiative is undertaken to plan, create, improve, or expand something over a defined period.
-
C.
typeOfProject
Indicates the specific category or kind of project that an entity is associated with or classified under.
-
D.
shipProject
Indicates initiating, managing, or executing the delivery and release of a project from development to completion or deployment.
-
E.
subjectOfProject
Indicates that an entity serves as the main focus, topic, or target of a particular project.
- F. None of above.
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d86d9bf930819082b30cf6d169297c |
completed | April 10, 2026, 3:25 a.m. |
| NER | Named-entity recognition | batch_69e04fb0b51081908e652ec4992296fa |
completed | April 16, 2026, 2:55 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ff9090e25481909f142b54ac4802f8 |
completed | May 9, 2026, 7:52 p.m. |
| PD | Predicate disambiguation | batch_69e00526759c819088b80d85138b8974 |
completed | April 15, 2026, 9:37 p.m. |
Created at: April 10, 2026, 4:45 a.m.