Triple

T15703087
Position Surface form Disambiguated ID Type / Status
Subject Reliability Enhancement and Re-engining Program E380641 entity
Predicate instanceOf P0 FINISHED
Object aircraft life extension program C35743 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: aircraft life extension program
Context triple: [Reliability Enhancement and Re-engining Program, instanceOf, aircraft life extension program]
  • A. aviation safety audit program
    An aviation safety audit program is a systematic, structured process for evaluating and verifying an aviation organization’s compliance with safety regulations, standards, and best practices to identify risks and drive continuous safety improvement.
  • B. airline safety audit program
    A structured, systematic process used by airlines or regulators to evaluate and verify an airline’s compliance with safety standards, operational procedures, and risk management practices to ensure safe flight operations.
  • C. airlift program
    An airlift program is an organized operation that uses aircraft to rapidly transport people, equipment, or supplies—often in response to emergencies, military needs, or humanitarian crises.
  • D. aviation infrastructure plan
    An aviation infrastructure plan is a strategic blueprint that outlines the development, expansion, maintenance, and integration of airport facilities, airspace systems, and supporting services to safely and efficiently meet current and future air transportation needs.
  • E. stretched airliner variant
    A stretched airliner variant is a lengthened version of an existing aircraft model, typically achieved by adding fuselage sections to increase passenger or cargo capacity while retaining most of the original design and systems.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86d99e860819094b6957cde470f2c completed April 10, 2026, 3:25 a.m.
Created at: April 10, 2026, 4:45 a.m.