Triple

T15696081
Position Surface form Disambiguated ID Type / Status
Subject Northwest Power Act E380462 entity
Predicate shortName P43 FINISHED
Object Northwest Power Act E380462 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Northwest Power Act | Statement: [Northwest Power Act, shortName, Northwest Power Act]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Northwest Power Act
Context triple: [Northwest Power Act, shortName, Northwest Power Act]
  • A. Northwest Power Act chosen
    The Northwest Power Act is a U.S. federal law that governs energy planning and fish and wildlife protection in the Pacific Northwest, particularly in relation to the Columbia River’s hydroelectric resources.
  • B. Columbia River Treaty
    The Columbia River Treaty is a landmark 1964 agreement between the United States and Canada that coordinates hydropower generation and flood control in the Columbia River Basin.
  • C. Federal Water Power Act of 1920
    The Federal Water Power Act of 1920 was a U.S. law that established a comprehensive federal licensing and regulatory framework for hydroelectric power development on navigable waters and public lands.
  • D. Northwest Power and Conservation Council
    The Northwest Power and Conservation Council is a regional planning body for the U.S. Pacific Northwest that develops long-term power plans and fish and wildlife programs to balance energy needs with environmental protection.
  • E. Boulder Canyon Project Act
    The Boulder Canyon Project Act is a 1928 U.S. federal law that authorized the construction of Hoover Dam and the All-American Canal, enabling large-scale water storage and hydroelectric power development on the Colorado River.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86d99e860819094b6957cde470f2c completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e04f50ce848190a839c4fb7306d793 completed April 16, 2026, 2:54 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff7571f1888190b83af75ec9c7432b completed May 9, 2026, 5:57 p.m.
Created at: April 10, 2026, 4:44 a.m.