Triple
T15694524
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mytholmroyd Flood Alleviation Scheme |
E380423
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | flood alleviation scheme |
C18289
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: flood alleviation scheme Context triple: [Mytholmroyd Flood Alleviation Scheme, instanceOf, flood alleviation scheme]
-
A.
flood control facility
chosen
A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
-
B.
flood control agency
A flood control agency is an organization responsible for planning, implementing, and managing measures to prevent, mitigate, and respond to flooding in a specific region.
-
C.
levee system
A levee system is an integrated network of embankments, floodwalls, and related structures designed to contain or redirect water to protect land and infrastructure from flooding.
-
D.
river weir
A river weir is a low dam built across a river to raise the water level, regulate flow, and sometimes measure discharge or divert water.
-
E.
proposed dam project
A proposed dam project is a planned infrastructure initiative to construct a barrier across a waterway for purposes such as water storage, flood control, energy generation, or irrigation, pending approval and implementation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d86d99e860819094b6957cde470f2c |
completed | April 10, 2026, 3:25 a.m. |
Created at: April 10, 2026, 4:44 a.m.