Triple
T15677281
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Budma construction fair |
E377475
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | construction industry event |
C10662
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: construction industry event Context triple: [Budma construction fair, instanceOf, construction industry event]
-
A.
construction industry partnership
A construction industry partnership is a collaborative alliance between contractors, suppliers, designers, and other stakeholders formed to jointly plan, finance, and deliver construction projects more efficiently and profitably.
-
B.
construction pioneer
A construction pioneer is an innovative leader who introduces groundbreaking methods, materials, or technologies that significantly advance how the built environment is designed and constructed.
-
C.
construction management firm
A construction management firm is a professional organization that plans, coordinates, and oversees construction projects from inception to completion, ensuring they are delivered on time, within budget, and to specified quality and safety standards.
-
D.
architectural congress
chosen
An architectural congress is a formal gathering of architects, planners, scholars, and related professionals convened to discuss, present, and debate ideas, projects, and policies shaping the built environment.
-
E.
construction material
A construction material is any substance or product used in building and civil engineering works to form, support, protect, or finish structures.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85cd2e28481909d4e975bee20872f |
completed | April 10, 2026, 2:13 a.m. |
Created at: April 10, 2026, 4:16 a.m.