Triple
T1566863
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mark VI monorail trains |
E33451
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | automated people mover vehicle |
C8949
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: automated people mover vehicle Context triple: [Mark VI monorail trains, instanceOf, automated people mover vehicle]
-
A.
people mover system
A people mover system is an automated transportation network designed to efficiently move passengers over short to medium distances within confined areas such as airports, campuses, or urban centers.
-
B.
light rail vehicle
A light rail vehicle is a rail-based transit vehicle designed for urban and suburban passenger service, typically operating on dedicated or shared tracks with frequent stops and moderate capacity.
-
C.
self-balancing personal transporter
A self-balancing personal transporter is a compact, motorized vehicle that uses gyroscopic sensors and dynamic stabilization to keep itself upright while carrying a single rider.
-
D.
streetcar system
A streetcar system is an urban public transit network that operates rail vehicles on fixed tracks, typically embedded in city streets, to transport passengers along defined routes.
-
E.
cable car system
A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a885f11b048190935025a035302715 |
completed | March 4, 2026, 7:20 p.m. |
Created at: March 4, 2026, 7:27 p.m.