Triple

T15662160
Position Surface form Disambiguated ID Type / Status
Subject Federal Office of Transport E376592 entity
Predicate instanceOf P0 FINISHED
Object national transport authority C4656 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: national transport authority
Context triple: [Federal Office of Transport, instanceOf, national transport authority]
  • A. transport ministry
    The transport ministry is a government department responsible for planning, regulating, and overseeing a nation’s transportation systems and infrastructure, including roads, railways, air, and maritime transport.
  • B. national railway company
    A national railway company is a state-owned or state-controlled organization responsible for operating and managing a country's primary passenger and freight rail transport services and infrastructure.
  • C. transportation safety agency
    A transportation safety agency is an organization responsible for regulating, monitoring, and enforcing safety standards across transportation systems to prevent accidents and protect the public.
  • D. transportation organization chosen
    A transportation organization is an entity that plans, manages, and operates systems or services that move people or goods from one location to another.
  • E. national railway system
    A national railway system is a coordinated network of rail infrastructure, services, and governance that provides passenger and freight transportation across a country.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cd1564c8190991adda63bfab4b0 completed April 10, 2026, 2:13 a.m.
Created at: April 10, 2026, 4:15 a.m.