Triple
T15656323
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | National Trail |
E376450
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | recreational walking route designation |
C2913
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: recreational walking route designation Context triple: [National Trail, instanceOf, recreational walking route designation]
-
A.
recreation trail
A recreation trail is a designated path or route intended for non-motorized leisure activities such as walking, hiking, cycling, or horseback riding, often located in natural or scenic areas.
-
B.
trail designation
chosen
A trail designation is a label or classification assigned to a trail that defines its permitted uses, difficulty level, regulatory status, and other management or user information.
-
C.
rail trail
A rail trail is a multi-use path created from a disused railway corridor, typically used for walking, cycling, and other non-motorized recreation and transportation.
-
D.
pedestrian walkway
A pedestrian walkway is a designated path or corridor intended exclusively or primarily for people traveling on foot, providing safe and convenient passage separated from vehicular traffic.
-
E.
National Tourist Route
A National Tourist Route is a designated roadway or travel corridor recognized for its exceptional scenic, cultural, and recreational value, developed and managed to enhance visitor experiences and promote regional tourism.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85cd1564c8190991adda63bfab4b0 |
completed | April 10, 2026, 2:13 a.m. |
Created at: April 10, 2026, 4:15 a.m.