Triple
T1565584
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kennedy Space Center Launch Complex 39B |
E33424
|
entity |
| Predicate | notableLaunch |
P13405
|
FINISHED |
| Object |
STS-115
STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
|
E180038
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-115 | Statement: [Kennedy Space Center Launch Complex 39B, notableLaunch, STS-115]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: STS-115 Context triple: [Kennedy Space Center Launch Complex 39B, notableLaunch, STS-115]
-
A.
STS-120
STS-120 was a 2007 Space Shuttle mission to the International Space Station that delivered the Harmony (Node 2) module and featured a dramatic solar array repair spacewalk.
-
B.
STS-135
STS-135 was the final mission of NASA’s Space Shuttle program, flown by Atlantis in 2011 to resupply the International Space Station and conclude the shuttle era.
-
C.
STS-114
STS-114 was NASA’s 2005 Space Shuttle Discovery “Return to Flight” mission that marked the resumption of shuttle operations after the Columbia disaster, focusing on testing new safety procedures and resupplying the International Space Station.
-
D.
STS-109
STS-109 was a NASA Space Shuttle Columbia mission in 2002 that upgraded and refurbished the Hubble Space Telescope, significantly enhancing its scientific capabilities.
-
E.
STS-133
STS-133 was a 2011 NASA Space Shuttle mission that delivered supplies and the Permanent Multipurpose Module to the International Space Station as part of the final flights of the shuttle program.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: STS-115 Triple: [Kennedy Space Center Launch Complex 39B, notableLaunch, STS-115]
Generated description
STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: STS-115 Target entity description: STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
-
A.
STS-120
STS-120 was a 2007 Space Shuttle mission to the International Space Station that delivered the Harmony (Node 2) module and featured a dramatic solar array repair spacewalk.
-
B.
STS-135
STS-135 was the final mission of NASA’s Space Shuttle program, flown by Atlantis in 2011 to resupply the International Space Station and conclude the shuttle era.
-
C.
STS-114
STS-114 was NASA’s 2005 Space Shuttle Discovery “Return to Flight” mission that marked the resumption of shuttle operations after the Columbia disaster, focusing on testing new safety procedures and resupplying the International Space Station.
-
D.
STS-109
STS-109 was a NASA Space Shuttle Columbia mission in 2002 that upgraded and refurbished the Hubble Space Telescope, significantly enhancing its scientific capabilities.
-
E.
STS-133
STS-133 was a 2011 NASA Space Shuttle mission that delivered supplies and the Permanent Multipurpose Module to the International Space Station as part of the final flights of the shuttle program.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a885f11b048190935025a035302715 |
completed | March 4, 2026, 7:20 p.m. |
| NER | Named-entity recognition | batch_69aa61ddc9908190a4afca1c24400817 |
completed | March 6, 2026, 5:10 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ad40217be88190ae17abcf1541ec55 |
completed | March 8, 2026, 9:23 a.m. |
| NEDg | Description generation | batch_69ad44074024819087ae57d85cb89654 |
completed | March 8, 2026, 9:40 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69ad44a1f068819095752e05a0915063 |
completed | March 8, 2026, 9:42 a.m. |
Created at: March 4, 2026, 7:27 p.m.