Triple

T1565584
Position Surface form Disambiguated ID Type / Status
Subject Kennedy Space Center Launch Complex 39B E33424 entity
Predicate notableLaunch P13405 FINISHED
Object STS-115
STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
E180038 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-115 | Statement: [Kennedy Space Center Launch Complex 39B, notableLaunch, STS-115]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-115
Context triple: [Kennedy Space Center Launch Complex 39B, notableLaunch, STS-115]
  • A. STS-120
    STS-120 was a 2007 Space Shuttle mission to the International Space Station that delivered the Harmony (Node 2) module and featured a dramatic solar array repair spacewalk.
  • B. STS-135
    STS-135 was the final mission of NASA’s Space Shuttle program, flown by Atlantis in 2011 to resupply the International Space Station and conclude the shuttle era.
  • C. STS-114
    STS-114 was NASA’s 2005 Space Shuttle Discovery “Return to Flight” mission that marked the resumption of shuttle operations after the Columbia disaster, focusing on testing new safety procedures and resupplying the International Space Station.
  • D. STS-109
    STS-109 was a NASA Space Shuttle Columbia mission in 2002 that upgraded and refurbished the Hubble Space Telescope, significantly enhancing its scientific capabilities.
  • E. STS-133
    STS-133 was a 2011 NASA Space Shuttle mission that delivered supplies and the Permanent Multipurpose Module to the International Space Station as part of the final flights of the shuttle program.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: STS-115
Triple: [Kennedy Space Center Launch Complex 39B, notableLaunch, STS-115]
Generated description
STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: STS-115
Target entity description: STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
  • A. STS-120
    STS-120 was a 2007 Space Shuttle mission to the International Space Station that delivered the Harmony (Node 2) module and featured a dramatic solar array repair spacewalk.
  • B. STS-135
    STS-135 was the final mission of NASA’s Space Shuttle program, flown by Atlantis in 2011 to resupply the International Space Station and conclude the shuttle era.
  • C. STS-114
    STS-114 was NASA’s 2005 Space Shuttle Discovery “Return to Flight” mission that marked the resumption of shuttle operations after the Columbia disaster, focusing on testing new safety procedures and resupplying the International Space Station.
  • D. STS-109
    STS-109 was a NASA Space Shuttle Columbia mission in 2002 that upgraded and refurbished the Hubble Space Telescope, significantly enhancing its scientific capabilities.
  • E. STS-133
    STS-133 was a 2011 NASA Space Shuttle mission that delivered supplies and the Permanent Multipurpose Module to the International Space Station as part of the final flights of the shuttle program.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885f11b048190935025a035302715 completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69aa61ddc9908190a4afca1c24400817 completed March 6, 2026, 5:10 a.m.
NED1 Entity disambiguation (via context triple) batch_69ad40217be88190ae17abcf1541ec55 completed March 8, 2026, 9:23 a.m.
NEDg Description generation batch_69ad44074024819087ae57d85cb89654 completed March 8, 2026, 9:40 a.m.
NED2 Entity disambiguation (via description) batch_69ad44a1f068819095752e05a0915063 completed March 8, 2026, 9:42 a.m.
Created at: March 4, 2026, 7:27 p.m.