Triple

T1563778
Position Surface form Disambiguated ID Type / Status
Subject Alitalia E33385 entity
Predicate ceasedOperationsReason P11350 FINISHED
Object financial difficulties LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: financial difficulties | Statement: [Alitalia, ceasedOperationsReason, financial difficulties]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: ceasedOperationsReason
Context triple: [Alitalia, ceasedOperationsReason, financial difficulties]
  • A. ceasedOperation
    Indicates that an entity has stopped functioning, operating, or carrying out its activities, typically in a permanent or indefinite manner.
  • B. designationReason
    Indicates the reason or justification for assigning a particular designation or status to an entity.
  • C. reasonForDiscontinuation chosen
    Indicates that one entity specifies the cause or justification for stopping, ending, or withdrawing another entity, process, or activity.
  • D. abandonedReason
    Indicates the reason or cause for which something was abandoned, discontinued, or given up.
  • E. reasonForElimination
    Indicates the specific cause or justification for why an entity was removed, disqualified, or excluded from consideration.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885ef9cf48190b0af0f5ce3d02231 completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69a90fccd4b48190a44012888a00af7f completed March 5, 2026, 5:08 a.m.
PD Predicate disambiguation batch_69a907b872f0819096b3df6ad502c63e completed March 5, 2026, 4:34 a.m.
Created at: March 4, 2026, 7:27 p.m.