Triple

T1563735
Position Surface form Disambiguated ID Type / Status
Subject Molonglo River E33384 entity
Predicate impoundedBy P10781 FINISHED
Object Scrivener Dam E147549 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Scrivener Dam | Statement: [Molonglo River, impoundedBy, Scrivener Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Scrivener Dam
Context triple: [Molonglo River, impoundedBy, Scrivener Dam]
  • A. Scrivener Dam chosen
    Scrivener Dam is a concrete gravity dam in Canberra, Australia, built across the Molonglo River to create Lake Burley Griffin as the city’s central ornamental lake.
  • B. The Dam
    The Dam is the official name of the Oregon State Beavers football student section, known for its loud, energetic support at home games in Corvallis.
  • C. Yellowtail Dam
    Yellowtail Dam is a large concrete arch-gravity dam on the Bighorn River in Montana, United States, primarily used for hydroelectric power generation, irrigation, and flood control.
  • D. Parker Dam
    Parker Dam is a concrete arch-gravity dam on the Colorado River best known for creating Lake Havasu and supplying water and hydroelectric power to parts of California and Arizona.
  • E. O'Shaughnessy Dam
    O'Shaughnessy Dam is a concrete arch-gravity dam in Yosemite National Park that creates the Hetch Hetchy Reservoir, supplying water and hydroelectric power to the San Francisco Bay Area.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885ef9cf48190b0af0f5ce3d02231 completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69a9089c7b9881909e44fee8053ac189 completed March 5, 2026, 4:37 a.m.
NED1 Entity disambiguation (via context triple) batch_69ad68079e448190b71c2cd194abeb86 completed March 8, 2026, 12:13 p.m.
Created at: March 4, 2026, 7:27 p.m.