Triple

T15629570
Position Surface form Disambiguated ID Type / Status
Subject Waterloo House, Sydney E375773 entity
Predicate instanceOf P0 FINISHED
Object interwar building C240 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: interwar building
Context triple: [Waterloo House, Sydney, instanceOf, interwar building]
  • A. Streamline Moderne building
    A Streamline Moderne building is a late Art Deco architectural form characterized by smooth, curving surfaces, horizontal lines, nautical or aerodynamic motifs, and minimal ornamentation that evoke speed and modernity.
  • B. modernisme building
    A modernisme building is an early 20th-century architectural structure characterized by organic forms, rich ornamentation, innovative use of materials, and a synthesis of arts and crafts, particularly associated with Catalan Modernism.
  • C. Mediterranean Revival building
    A Mediterranean Revival building is an architectural structure characterized by stucco walls, red tile roofs, arches, and ornamental details inspired by Spanish, Italian, and other Mediterranean coastal traditions.
  • D. building chosen
    A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
  • E. neo-Renaissance building
    A neo-Renaissance building is a structure designed in the 19th- or early 20th-century revival style that emulates Italian Renaissance architecture through features like symmetrical façades, round-arched windows, classical columns, and richly ornamented cornices.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cd035a48190b73d5579ab73969a completed April 10, 2026, 2:13 a.m.
Created at: April 10, 2026, 4:14 a.m.