Triple
T1561927
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Interstate 87 |
E33344
|
entity |
| Predicate | nextRoute |
P18011
|
FINISHED |
| Object | Interstate 88 |
E164684
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 88 | Statement: [Interstate 87, nextRoute, Interstate 88]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Interstate 88 Context triple: [Interstate 87, nextRoute, Interstate 88]
-
A.
Interstate 88
chosen
Interstate 88 is a major east–west highway in Illinois that connects the Chicago metropolitan area with the Quad Cities and serves as a key regional transportation corridor.
-
B.
Interstate 74
Interstate 74 is a major east–west U.S. Interstate Highway that runs through multiple Midwestern and Southeastern states, including a segment in North Carolina.
-
C.
Interstate 82
Interstate 82 is a major U.S. highway in the Pacific Northwest that connects central Washington to northeastern Oregon, facilitating regional travel and commerce.
-
D.
Interstate 94
Interstate 94 is a major east–west U.S. Interstate Highway running from Montana to Michigan, serving key Midwestern cities such as Minneapolis–Saint Paul, Milwaukee, and Chicago.
-
E.
Interstate 185
Interstate 185 is a spur route of Interstate 85 in western Georgia that connects the Columbus area to the main interstate network.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a885ef9cf48190b0af0f5ce3d02231 |
completed | March 4, 2026, 7:20 p.m. |
| NER | Named-entity recognition | batch_69a9088710a881909a1226e4b54311b8 |
completed | March 5, 2026, 4:37 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c8681d57c08190b72d1b010db3a065 |
completed | March 28, 2026, 11:45 p.m. |
Created at: March 4, 2026, 7:27 p.m.