Triple

T1561258
Position Surface form Disambiguated ID Type / Status
Subject Los Ángeles Basin E33327 entity
Predicate landUseChange P7886 FINISHED
Object expansion of intensive agriculture LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: expansion of intensive agriculture | Statement: [Los Ángeles Basin, landUseChange, expansion of intensive agriculture]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: landUseChange
Context triple: [Los Ángeles Basin, landUseChange, expansion of intensive agriculture]
  • A. otherLandUse
    Indicates that the land is used for purposes that do not fall into any of the primary or predefined land-use categories.
  • B. primaryLandUse
    Indicates the main or dominant way in which a given piece of land is utilized or designated (e.g., residential, agricultural, commercial).
  • C. secondaryLandUse
    Indicates a secondary or additional way in which a piece of land is used, beyond its primary designated use.
  • D. landPolicy
    Indicates a relationship where an authority defines or applies rules governing the ownership, use, management, or distribution of land.
  • E. urbanDevelopment chosen
    Indicates the process or activities through which urban areas are planned, expanded, or transformed, including changes to infrastructure, land use, and the built environment.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885ef9cf48190b0af0f5ce3d02231 completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69a9407d9d1481909597af97b16512cc completed March 5, 2026, 8:36 a.m.
PD Predicate disambiguation batch_69a907b688d081908171f89010c53973 completed March 5, 2026, 4:33 a.m.
Created at: March 4, 2026, 7:27 p.m.