Triple

T15609715
Position Surface form Disambiguated ID Type / Status
Subject Pearl River Tower E375254 entity
Predicate instanceOf P0 FINISHED
Object high‑rise building C36407 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: high‑rise building
Context triple: [Pearl River Tower, instanceOf, high‑rise building]
  • A. high-rise district
    A high-rise district is an urban area characterized by a dense concentration of tall, multi-story buildings used for residential, commercial, or mixed purposes.
  • B. commercial high-rise
    A commercial high-rise is a tall, multi-story building primarily designed and constructed to house businesses, offices, and other commercial activities within an urban environment.
  • C. megatall skyscraper
    A megatall skyscraper is an exceptionally high-rise building exceeding 600 meters in height, designed to maximize vertical space for mixed-use functions while showcasing advanced engineering and architectural innovation.
  • D. tower complex
    A tower complex is a multi-structure architectural ensemble dominated by one or more tall vertical towers integrated with surrounding buildings, plazas, and circulation spaces into a cohesive functional and visual unit.
  • E. civic skyscraper
    A civic skyscraper is a tall, prominently located high-rise building that houses public or governmental functions, symbolizing civic identity and serving as a hub for community services and administration.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85ccf2794819096cda4cbcb02d478 completed April 10, 2026, 2:13 a.m.
Created at: April 10, 2026, 4:13 a.m.