Triple
T15604229
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tsukuba Express |
E375114
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | high-speed commuter railway |
C29452
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: high-speed commuter railway Context triple: [Tsukuba Express, instanceOf, high-speed commuter railway]
-
A.
rapid rail system
chosen
A rapid rail system is a high-speed, high-capacity railway network designed to transport large numbers of passengers quickly and efficiently between urban or regional destinations using dedicated tracks and frequent service.
-
B.
rapid transit line
A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
-
C.
commuter rail line
A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
-
D.
suburban commuter train
A suburban commuter train is a passenger rail service designed to transport people efficiently between residential suburbs and urban centers, typically operating on fixed schedules with frequent stops during peak travel times.
-
E.
passenger rail service
Passenger rail service is a transportation system that operates trains to carry people between locations on a scheduled basis, typically offering various classes of comfort and amenities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85cce25008190b13b52745fbd719b |
completed | April 10, 2026, 2:13 a.m. |
Created at: April 10, 2026, 4:12 a.m.