Triple

T15598613
Position Surface form Disambiguated ID Type / Status
Subject Dark Energy Spectroscopic Instrument E374970 entity
Predicate surveyStartDate P288 FINISHED
Object 2021 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2021 | Statement: [Dark Energy Spectroscopic Instrument, surveyStartDate, 2021]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: surveyStartDate
Context triple: [Dark Energy Spectroscopic Instrument, surveyStartDate, 2021]
  • A. startDate chosen
    Indicates the point in time when an event, state, or relationship begins.
  • B. startDateAsGuerrilla
    Indicates the date on which an entity began operating or acting in a guerrilla capacity.
  • C. dataCollectedOn
    Indicates that certain data was gathered, recorded, or measured at a specific point in time or on a particular date.
  • D. previewStartDate
    Indicates the date and time when a preview period for something begins.
  • E. estimatedStartDate
    Indicates the date on which something is expected or planned to begin, based on current information or projections.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cce25008190b13b52745fbd719b completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69e04e609ab081909feb486a57439960 completed April 16, 2026, 2:50 a.m.
PD Predicate disambiguation batch_69deda844af081909e658ebc9d9b403d completed April 15, 2026, 12:23 a.m.
Created at: April 10, 2026, 4:12 a.m.