Triple
T15585398
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Baroon Pocket Dam |
E374606
|
entity |
| Predicate | isPartOf |
P10
|
FINISHED |
| Object |
South East Queensland Water Grid
The South East Queensland Water Grid is an integrated regional network of dams, treatment plants, and pipelines designed to share and secure urban water supplies across South East Queensland, Australia.
|
E1165723
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: South East Queensland Water Grid | Statement: [Baroon Pocket Dam, isPartOf, South East Queensland Water Grid]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: South East Queensland Water Grid Context triple: [Baroon Pocket Dam, isPartOf, South East Queensland Water Grid]
-
A.
Brisbane Water catchment
The Brisbane Water catchment is the hydrological drainage area that collects and channels water into Brisbane Water on the Central Coast of New South Wales, Australia.
-
B.
Murray–Darling Basin water management system
The Murray–Darling Basin water management system is an integrated network of rivers, dams, and regulatory infrastructure designed to allocate, store, and manage water resources across southeastern Australia’s largest river basin for agriculture, communities, and the environment.
-
C.
Gold Coast waterway network
The Gold Coast waterway network is an interconnected system of rivers, canals, estuaries, and waterways in Queensland’s Gold Coast region, supporting recreation, transport, and coastal ecosystems.
-
D.
New South Wales irrigation districts
The New South Wales irrigation districts are major agricultural regions in southeastern Australia that rely on large-scale water diversion and storage schemes to support intensive crop and livestock production.
-
E.
Sydney drinking water supply system
The Sydney drinking water supply system is the extensive network of dams, reservoirs, rivers, and treatment infrastructure that provides potable water to the Sydney metropolitan region.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: South East Queensland Water Grid Triple: [Baroon Pocket Dam, isPartOf, South East Queensland Water Grid]
Generated description
The South East Queensland Water Grid is an integrated regional network of dams, treatment plants, and pipelines designed to share and secure urban water supplies across South East Queensland, Australia.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: South East Queensland Water Grid Target entity description: The South East Queensland Water Grid is an integrated regional network of dams, treatment plants, and pipelines designed to share and secure urban water supplies across South East Queensland, Australia.
-
A.
Brisbane Water catchment
The Brisbane Water catchment is the hydrological drainage area that collects and channels water into Brisbane Water on the Central Coast of New South Wales, Australia.
-
B.
Murray–Darling Basin water management system
The Murray–Darling Basin water management system is an integrated network of rivers, dams, and regulatory infrastructure designed to allocate, store, and manage water resources across southeastern Australia’s largest river basin for agriculture, communities, and the environment.
-
C.
Gold Coast waterway network
The Gold Coast waterway network is an interconnected system of rivers, canals, estuaries, and waterways in Queensland’s Gold Coast region, supporting recreation, transport, and coastal ecosystems.
-
D.
New South Wales irrigation districts
The New South Wales irrigation districts are major agricultural regions in southeastern Australia that rely on large-scale water diversion and storage schemes to support intensive crop and livestock production.
-
E.
Sydney drinking water supply system
The Sydney drinking water supply system is the extensive network of dams, reservoirs, rivers, and treatment infrastructure that provides potable water to the Sydney metropolitan region.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85ccd575081908909b71a3f3e3a61 |
completed | April 10, 2026, 2:13 a.m. |
| NER | Named-entity recognition | batch_69e04e4900408190aadb48b001db4169 |
completed | April 16, 2026, 2:49 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ff4c5166d88190ab14c7779e3e8e1f |
completed | May 9, 2026, 3:01 p.m. |
| NEDg | Description generation | batch_69ff50183f608190811cbff769cdd110 |
completed | May 9, 2026, 3:17 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69ff52eedbc08190be2f62326b00c8c7 |
completed | May 9, 2026, 3:29 p.m. |
Created at: April 10, 2026, 4:11 a.m.