Triple
T15577762
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sepulveda Basin |
E374412
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | flood control basin |
C18289
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: flood control basin Context triple: [Sepulveda Basin, instanceOf, flood control basin]
-
A.
flood control facility
chosen
A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
-
B.
levee system
A levee system is an integrated network of embankments, floodwalls, and related structures designed to contain or redirect water to protect land and infrastructure from flooding.
-
C.
man-made basin
A man-made basin is an artificially constructed depression or container designed to hold or manage water or other liquids for purposes such as storage, irrigation, drainage, or industrial use.
-
D.
reservoir dam
A reservoir dam is a large engineered barrier built across a watercourse to store and regulate water in an upstream reservoir for purposes such as water supply, flood control, irrigation, and power generation.
-
E.
Dam
A dam is a large engineered barrier built across a waterway to control water flow, create reservoirs, and support purposes such as water supply, flood control, irrigation, and power generation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85ccd575081908909b71a3f3e3a61 |
completed | April 10, 2026, 2:13 a.m. |
Created at: April 10, 2026, 4:11 a.m.