Triple

T15560598
Position Surface form Disambiguated ID Type / Status
Subject Snowy Hydro Limited E370985 entity
Predicate gridConnection P845 FINISHED
Object National Electricity Grid of Australia E446823 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: National Electricity Grid of Australia | Statement: [Snowy Hydro Limited, gridConnection, National Electricity Grid of Australia]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: National Electricity Grid of Australia
Context triple: [Snowy Hydro Limited, gridConnection, National Electricity Grid of Australia]
  • A. Tasmanian power grid
    The Tasmanian power grid is the integrated electricity generation, transmission, and distribution network that supplies power across the Australian island state of Tasmania, heavily reliant on hydroelectric resources.
  • B. National Electricity Market chosen
    The National Electricity Market is Australia's interconnected wholesale electricity grid and trading market that coordinates the generation and distribution of power across the eastern and southern states.
  • C. New Zealand electricity grid
    The New Zealand electricity grid is the nationwide high-voltage transmission and distribution network that carries power from generation sources, including major hydro schemes, to homes and businesses across the country.
  • D. North American power transmission grid
    The North American power transmission grid is the vast, interconnected high-voltage network that delivers electricity across the United States, Canada, and parts of Mexico through several major synchronized interconnections.
  • E. Ontario electricity grid
    The Ontario electricity grid is the province-wide interconnected network of power generation, transmission, and distribution infrastructure that delivers electricity to homes, businesses, and industries across Ontario, Canada.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cc6cf40819091f4a5facee1ebe6 completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69e04ddb4c0c81909b3f4c75c91f7f3f completed April 16, 2026, 2:47 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff456635588190a2473bcff3ae4a53 completed May 9, 2026, 2:32 p.m.
Created at: April 10, 2026, 4:09 a.m.